Building work

The old tent is now leaking. We plan to replace it for next season with a wooden cabin. The first job is to prepare a concrete base and lay pipes for water and drainage – see the photos below.

Preparing base for cabin 1

P1020526 (640x427)

 

 

 

 

 

In the meantime the weather has been very hot and we have hardly seen any pilgrims at all. However two ladies stopped today for Morning Prayer- with the noise of the digger at work outside the tent!